04 / Delivery Portfolio

Programs

Every major program national DWDM/IP core, wholesale capacity, core migrations and 24/7 operations with contract value and scope.

Delivery portfolio

PRG-01National Telecom · Managed Services
In Service1.45 Mn OMR

Omantel–Ciena L3 Support & SPMS

End-to-end Level-3 engineering support and Spare Parts Management System (SPMS) for the Omantel–Ciena optical estate: DWDM core, metro and access. The largest managed-services engagement in the portfolio, keeping national wholesale and enterprise transport running with governed escalation, spares logistics, and vendor coordination against strict availability targets.

Ciena 6500DWDMBlue Planet MCPL3 EngineeringSPMSSLA Governance
PRG-02National Backbone · Metro Optical
Delivered1.3 Mn OMR

Omantel ECTN Metro Rings Phase 2 (WO#9)

Deployment of Omantel's metro optical rings under the Evolve Core Transport Network frame contract Phase 2. Delivered resilient ring topology across core metropolitan sites to carry rapidly growing wholesale and enterprise traffic, coordinated across multiple live sites without service disruption.

Ciena 6500PhotonicMetro RingsOTNROADM
PRG-03National Backbone · Wholesale Capacity
Delivered1.2 Mn OMR

Omantel ECTN 11.9T Wholesale Expansion (WO#18)

Addition of 11.9 Terabits of wholesale capacity across core ECTN sites, spanning nine locations (Seeb, TCC, Equinix DC, Blue City, Azaiba, Bustan, Suwaiq, Khatmat Malaha and R. Khela), new photonic links, a 400G Awasr scope, and spectrum defragmentation including 800G provisioned between MC1 and Blue City at short notice on customer demand.

Ciena 6500DWDMPhotonic Links400GSpectrum Defrag
PRG-04National Backbone · Photonic
Delivered1.1 Mn OMR

Omantel ECTN Photonic Links + 14.1T (WO#20)

Build of three direct photonic links between Equinix, Seeb, Blue City and Suwaiq, plus the addition of 14.1 Terabits of wholesale traffic between core ECTN sites. Extended the photonic layer of the national backbone while lifting inter-city wholesale capacity for Omantel's carrier customers.

Ciena 6500Photonic LayerDWDM14.1TWholesale
PRG-05Enterprise · Wireless Design
Delivered1.0 Mn OMR

In-Building Wi-Fi Solution Enterprise

Design, supply, installation, testing and optimization of in-building wireless coverage for Omantel enterprise customers including the Royal Flight office in Seeb and Al Araimi Boulevard with predictive RF site surveys and centralized activity monitoring. Delivered full-venue coverage for a TRA press conference within hours of the event start, earning a customer commendation.

ArubaEkahau SurveyWi-Fi DesignRF OptimizationStructured Cabling
PRG-06National Backbone · IP Core
Delivered950K OMR

Omantel ECTN IP Core & Metro Phase 3 (WO#11)

Expansion of the IP core and metro rings under Phase 3 of the Evolve Core Transport Network programme scaling routing and transport capacity across the national backbone to meet sustained wholesale and enterprise growth.

IP CoreMPLSCiena 6500Metro Rings
PRG-07Wholesale IP · Core Migration
Delivered500K OMR

Cisco IGW Core Router Migration

Supply, installation and service migration of Omantel's wholesale IP/MPLS core onto Cisco 8808 routers replacing legacy Juniper PTX3K and Huawei equipment and migrating core, international and national services with added 100G capacity to a new core site. A high-risk, live-network cutover delivered inside the committed timeline.

Cisco 8808IP/MPLSJuniper PTX100GCore Cutover
PRG-08Public Safety · Operations
Live 24/7210K OMR

ROP Dhahirah 24/7 Communications O&M

24/7/365 operations and maintenance of 80 communications sites across the Dhahirah region of Oman PDO and non-PDO, green-field, brown-field, rooftop and helicopter-access sites. Sustained service continuity for critical public-safety communications under demanding terrain and access constraints.

MicrowavePower & TowerField O&MSLAAccess Logistics
PRG-09Coastal Infrastructure · Civil + Telecom
Delivered30K OMR

Damaniyat Island 35m Telecom Tower

Foundation and erection of a 35-metre telecom tower on Damaniyat Island. Every item of material and equipment was moved by RNO ferry, with the build sequenced around tides and weather and coordinated across Omantel, the Royal Navy of Oman, suppliers and the workforce a small-value program that demanded outsized logistics and multi-agency planning.

Civil WorksTower ErectionSea LogisticsMulti-agency